Small Prairie 4561 GWR 45XX class 2-6-2 tank · West Somerset Railway Association

Small Prairie 4561 Restoration diary

Progress reports from Williton, Minehead and Lancashire, with photographs, from 2020 to today.

4561: Brake gear refitted at Williton (photo 1) Brake gear refitted at Williton Pictures by Matt Healey WSRA’s Small Prairie Tank 4561 has taken another step forward with the brake gear being refitted. The chassis is currently being worked on by… 4561: Side tank riveting nears completion (photo 1) Side tank riveting nears completion Today the tank was lifted and turned onto its back so we could use the ‘squeezer’ with the hydraulic power pack to close up the 50 rivets that… 4561: Eccentrics machined and fitted (photo 1) Eccentrics machined and fitted Pictures by Matt Healey The pictures show.the machining and fitting of 4561’s eccentrics after white metaling. First published on the WSRA 4561 restoration blog. 4561: Side tank top sheet in place (photo 1) Side tank top sheet in place Before the top sheet was finally put in position the fixing bolts for the air vent, feed pipe bracket and top inspection cover were welded in place. These… 4561: Chassis work at Williton: rod bearings (photo 1) Chassis work at Williton: rod bearings Work is continuing on the chassis at Williton. Thanks to Ryan & Matt for their work on the rod bearing. First published on the WSRA 4561 restoration blog. 4561: Side tanks: drilling the inside platework (photo 1) Side tanks: drilling the inside platework Further Progress is being made on 4561’s at Minehead All of the 10mm holes that were laser cut in the inside platework have now been drilled through and… 4561: Side tank outer sheets fitted (photo 1) Side tank outer sheets fitted More Progress on the Side Tanks Paul Orrells reports more good progress at Minehead, all of the fixing holes for the outside sheets have been drilled. The sheets… 4561: The right-hand side tank takes shape (photo 1) The right-hand side tank takes shape Work continues on the Side Tanks Work has proceeded extremely well on the right hand tank over the last few weeks as per the attached pictures. 7/10/2025 –… 4561: Side tank sections shot blasted and painted (photo 1) Side tank sections shot blasted and painted More progress on the Side Tanks As we approach the end of September 2025 Paul Orrells writes: The two bottom floor sections and the two front sides of… 4561: New side tanks started at Minehead (photo 1) New side tanks started at Minehead Side Tanks A team of 4 volunteers in Minehead workshops who built the replacement water tank for tender T2061, presently running with Odney Manor, have made arrangements to… 4561: Boiler assessment and the decision to build new side tanks (photo 1) Boiler assessment and the decision to build new side tanks Boiler It’s been a while since we bid goodbye to 4561’s boiler and waved it off on its journey to Rileys. Riley’s then had to complete a full… 4561: Boiler at Riley and Son: firebox removed (photo 1) Boiler at Riley and Son: firebox removed It’s been almost 6 months since this blog was last updated and things have moved on quite a lot. There was a pause in proceedings whilst the Trustees…